8 weeks in. We’re knackered lol. We’ve been pretty much full time at it, and for sure, there are quicker/simpler ways to build than the way we are doing it. Its a balance!
In summary, in weeks 6-8 we’ve done:-
- Front bulkhead made (with removable door)
- Offside window completed
- Water tank & heater installed (not commissioned)
- 240v installed (not complete)
- Plumbing initiated
- Nearside door started
- Cab curtains and “finished” complete
- Battery-battery system and 240v charger all working
- Tracker & Dashcam installed/working
- Lounge sofas made (upholstery in a couple of weeks)