I bought a Pro Plate for £22 + postage from https://www.ebay.co.uk/itm/143860150248 – and requested the black version. All arrived, and I’ve been procrastinating for ages! Anyway, today is the day…. The idea of this plate is the Sevel vans are susceptible to a simple attack where a screwdriver puncture under a keyed…
Well we have now had over 60 nights away (video made 10 nights ago!) – and thought it was time to leave some feedback on how things are. Good & Updated Layout Reliability Usability Refillable gas system Garage lining Bad & thing not needed and to consider Floor adhesive colour…
Having not gone the maxx-air route for a couple of reasons, and the van being hot, I’ve made my own vent fan. This is to either blow hot air out of the van, or blow cool air into the van (over the bed) if needed. On high-ish power, it blows…
April 12th meant that, being self contained, we were able to go out in the van to a campsite for the first time. So first test for cooking and shower and some other bits. So how was it….
Ok, I say finished, I mean mostly finished. But after 6mths full time+ effort, well over 1000 hours, I’m declaring the van complete. The only outstanding bits are trivial or “upgrades” to temporary bits. But at the moment, its fully usable and complete and the rest can wait till the…
Almost Christmas, almost finished, but lots of little jobs to do. Maybe 2-3 weeks solid work, but as its Christmas and party time it may be longer. I say party time, in days of Covid I mean just being lazy and eating crap. In this update, we’ve finished the ceiling,…
20 weeks. Its now winter. Brrrrr! Built is progressing, and the van is almost usable! Everything works, and we now have solar connected (2x 150w panels) which is great as it keeps the engine battery topped up too (Epever 20A MPPT via Votronic 1230). In mid November when the sun…
A video covering the install and configuration of our water and waste system
This video is just an overview of our 240v system in the van. Bear in mind, I’m me, I’m a DIYer, I’m not certified in anything electrical, I’ve never read the regulations, I just blag along the way and use google. Do not blindly copy anything I’ve done; do not…
Blimey – ignore the video saying it was week 14/15 – I think time is flying! But, the bathroom is now fully complete and working. And yes, that took almost 3 weeks (!) We’re really pleased with it. The photos linked above show the build process